Patio area
length × widthCalculates the finished rectangle before irregular edges are added.
Adjust the project details to update the estimate.
Patio area
Finished square footage for the selected dimensions.
224 sq ft
Pavers
Approximate units with a small allowance for cuts.
1,129
Base material
Compacted aggregate volume below the pavers.
2.8 cu yd
Bedding sand
A planning quantity for the setting layer.
$1,792–$4,032
Patio area: length × width
Estimates use standard planning formulas. Verify quantities with your supplier or contractor before ordering.
See your project with AIPlan a paver patio from its finished footprint, paver format, and compacted base depth. The estimate keeps the visible surface and foundation materials together.
Measure the finished length and width, including only the surface that will receive pavers. Break curves and bump-outs into smaller rectangles rather than forcing one oversized measurement.
Paver size changes the unit count, while base depth changes the aggregate volume. The visible pavers are only one part of a durable patio; edge restraint and a properly compacted subbase matter too.
Add excavation, soil disposal, delivery, geotextile, drainage, edge restraint, and labor when comparing bids. Local soil and freeze-thaw conditions can change the recommended base depth.
length × widthCalculates the finished rectangle before irregular edges are added.
area × pavers_per_sq_ft × 1.05Uses the chosen unit coverage and adds five percent for cuts.
area × depth ÷ 12 ÷ 27Converts an inch depth into cubic yards of compacted base.
The right depth depends on soil, climate, drainage, and use. A residential walkway and a vehicle area should not be assumed to share one specification.
No. The calculator estimates material quantities. Excavation and disposal depend on access, soil, grade, and the existing surface.
Yes. Five percent is a useful starting allowance; complicated borders or diagonal patterns can need more.
See paver colors, planting edges, furniture, and the home facade together with AI.